Take a look at the quality work we’ve completed.

New cabinets, countertops, dishwasher, disposal, subfloor, vinyl floor, tile board backsplash, exhaust fan (outside vent) and additional outlets added.

New cabinets, countertops, dishwasher, disposal, tile floor, tile board backsplash, exhaust fan (outside vent) and additional outlets added.

Broken rails removed and replaced with sturdy walls trimmed with stained/finished oak accents. This also shows part of the new patio door that was installed.

New floor tile installed.

New tub and surround, tile floor, sink installed.

16 foot door and entry door added.

Siding, soffit and aluminum trim added.

Custom mantel added. Mantel and trim is solid oak and ash.

LEFT: Small entryway with colorful tile. RIGHT: End of tile floor in kitchen, transitions to carpet in living room.

LEFT: New tub, tile floor, cabinet. RIGHT: Tile floor in kitchen before cabinets installed.

5 inch concrete slab being poured.

LEFT: Tile set on slab. RIGHT: Woodstove added.

LEFT: 9-1/2 foot deep pool that needs removed. RIGHT: Dumpster full of pool pieces.

LEFT: Removing part of pool. RIGHT: Filling in hole where pool used to be.

LEFT: View before pouring concrete. RIGHT: After pouring concrete floor.

LEFT: Roof sheeting being replaced. RIGHT: 2 layers of Grace (ice) shield on 5-12 pitch roof.

LEFT: Due to 2/12 pitch entire roof covered with ice shield and additional 1 in overlap on shingles. RIGHT: Garage roof sag removed by adding trusses piece by piece.

LEFT: Vent going through roof. RIGHT: R-30 fiberglass insulation installe in roof.

LEFT: New trim and soffit added to a garage. RIGHT: Styrofoam vents added for roof ventilation.

LEFT: New Aluminum trim and soffit. RIGHT: New soffit with vent for interior exhaust fan. Nice and clean. No holes in roof or siding!

LEFT: Completed Roof before soffit reinstalled. RIGHT: After soffit installed.

LEFT: Foundation ready to be poured. RIGHT: New electrical notice metal plates on studs to prevent nails or screws from piercing wire.

LEFT: New electrical and windows in new section. Also notice vents for roof ventilation. RIGHT: After drywall finished and carpet installed.

LEFT: View of plumbing to add 2nd bath. RIGHT: 2nd bath added in new section.

LEFT: Additional pieces added to hang drywall from. RIGHT: New walls framed in, new electrical added. R-13 insulation installed in walls.

LEFT: Alll foundations dug to 42 inches or deeper. RIGHT: Foundation trench 42 in deep.

LEFT: Foundation ready to be poured. RIGHT: Foundation trench for front porch.

LEFT: Full bath tub installed. RIGHT: Insulated heating duct.

LEFT: New garage door installed (fire door required by code). RIGHT: Furnace room now located in garage (left side of picture),

LEFT: Living room complete. RIGHT: Middle bedroom complete with carpeting.

LEFT: New Cabinets, dishwasher, disposal, tile board backsplash, vinyl floor and extra outlets added. RIGHT: House after new roof added.

LEFT: Custom welding, work bench frame with 5 inch casters, very easy to move. RIGHT: Another custom work bench.